HOME
ABOUT
Company Profile
Enterprise advantages
Honorary Qualifications
Partner
PRODUCT
Bitumen Waterproof Membranes
TPO / PVC Waterproof Membranes
Tape Products
Coating Series
CASE
NEWS
CONTACT
ENGINEERING CASE
It will focus on technological innovation to provide professional waterproof solutions for the industry’s high-quality development
National Project
Its products are used in 'Belt and Road' projects, national high-speed rail projects and Top 500 real estate cooperative projects.
Inland-to-Coastal Intercity Railway Dedicated Line
Total line length 82 km, double-track passenger line with design speed 250–350km/h, total estimated investment RMB 11 billion, multiple large bridges crossing lake and mountain
North-South National High-Speed Rail Trunk (South Hunan Section)
Main line length approx. 450 km, 350km/h double-track passenger railway, dozens of kilometer-level cross-water railway bridges, key inter-provincial transport infrastructure of national railway network.
Double-Track Electrified Intercity Passenger Dedicated Line
New main line length 114 km, design speed 250km/h (expandable to 350km/h), total investment RMB 13.6–18.6 billion, multi-cross-sea river super-large railway bridges.
National "Eight Vertical & Eight Horizontal" Coastal High-Speed Rail Corridor
Core national high-speed railway artery, full length over 5,000 km across 10 coastal provinces & cities, total investment over RMB 1 trillion, 350km/h standard with dozens of large cross-water bridges.
Cross-Border Industrial Park Office & Vocational Training Complex
Land area 81 mu, total construction area 103,000 ㎡, total investment RMB 391 million; headquarters office towers + training complex accommodating 5,000 trainees at one time, cross-border industry cooperation carrier.
National Large-Scale Integrated Petrochemical Refining Project
Phase I total investment RMB 12.3 billion, basic crude oil processing capacity 5 million tons/year, upgraded to 8 million tons/year; supporting 200,000 tons/year polypropylene plant and 3.2 million m³ crude oil reserve tank farm, core regional energy supply base.
Deep-Water Port & Ocean Logistics Hub Project
With berths for 10,000-ton ocean-going vessels, long breakwaters and multi-group professional cargo terminals, capable of docking multiple large cargo ships simultaneously, supporting national coastal industrial logistics system.
Super Large Coastal Integrated Real Estate & Cultural Tourism Project
Total land area 6,676 mu, total construction area 3.29 million ㎡, total investment over RMB 30 billion, equipped with 7.9km ecological coastline & 400+ mu wetland ecological zone. Deep-Water Port & Ocean Logistics Hub Project
Other engineering projects
打开微信“扫一扫” 即可分享到微信
Hotline:
+86 177 0772 7356
+86 136 5772 4693
+86 191 0110 9334
Email:
gxjpfs@gmail.com/
Address:
Building 4, Information Port, No. 95 Lu Ban Road, Xixiangtang District, Nanning City